Thursday, January 6, 2011

OCC Flood Plain Friendly

    • Also, we are very conscious of the environment and have had engineering studies done to insure we will have no impact on the flood plain and flood way. We will put the building on piers or 'big stilts' so that the water table and water flow will not be effected. We know our 125-year floods come about every three years," Lee said.
    • The impermeable parking lot surface probably will be replaced with permeable pavers and swales to allow natural drainage, she added.
Posted from Diigo. The rest of my favorite links about DesPlaines are here.

No comments:

Post a Comment